Advanced Vehicles
Home
Testing
Vehicle Battery Testing
Charging System Testing
Vehicle Testing
Real World Demonstrations
Data
Library
About Us
Charging System Testing - Charging Infrastructure Studies
Learn More
Learn More
Learn More
Charging Infrastructure Studies
Charging Infrastructure Planning
Considerations for Corridor and Community DC Fast Charging Complex System Design
– May 2017
Residential Charging Do's and Don'ts
– October 2016
Workplace Charging Do's and Don'ts
– October 2016
EV Charging Infrastructure Roadmap
– August 2016
Energy Storage for DC Fast Chargers Development and Demonstration of Operating Protocols for 20-kWH and 200-kWh Field Sites Report
– March 2013
Tacoma Power/AVTA PHEV Demand and Energy Cost Demonstration Analysis Report
– May 2010
PHEV Charging Infrastructure Review Report
– November 2008
Real World Charging Infrastructure Usage
West Coast Electric Highway
DC Fast Charger Usage in the Pacific Northwest During 2014
– January 2016
DC Fast Charger Usage in the Pacific Northwest During 2012 and 2013
– February 2015
New York State Public Charging Station Usage Reports
January - March 2016
October-December 2015
July– September 2015
April – June 2015
January – March 2015
October – December 2014
July – September 2014
April – June 2014
January – March 2014
October – December 2013
Electric Vehicle/Grid Integration
Evaluation of Vehicles and the Grid together as a System
(SLIDES) – April 2015
Vehicle-to-Grid (V2G) Power Flow Regulations and Building Codes Review by the AVTA
-– September 2012
The Development of a Charge Protocol to Take Advantage of Off- and On-Peak Demand Economics at Facilities
– February 2012
Bi-Directional Fast Charging Study Report
– February 2012
Vehicle to EVSE Smart Grid Communications Interface Research and Testing Report
– September 2011
Department of Defense Installation Electric Vehicle Preparedness Studies
Electric Vehicle Preparedness - Task 1: Assessment of Data and Survey Results for NAS Jacksonville and NS Mayport
– June 2013
Electric Vehicle Preparedness - Task 1: Assessment of Data and Survey Results for Joint Base Lewis McChord
– June 2013
Electric Vehicle Preparedness - Task 2: Identification of Joint Base Lewis McChord Vehicles for Installation of Data Loggers
– June 2013